Order process

From Idea to Home

First the model and the finish. We take a deposit, build it, crane it in, and set it on your plot in Latvia, Lithuania or Estonia.

  1. Step 1

    Model choice

    Apple cabin at 12 m² or Apple cabin XL at 28 m². We size it to the plot and the use — summer, rental, or a stay on the water.

    The first decision is the house, not the extras. Apple cabin is the compact 12 m² home: a private bedroom, kitchen and bathroom for a summer house, retreat or small rental. Apple cabin XL is 28 m² with two bedrooms, a living room, kitchen and bathroom — the model for families, guests, or a rental with more capacity.

    We talk through the plot, crane access, and how you will use the nights. You agree the model in writing. Everything after this — floors, glass, furniture — hangs off that choice.

  2. Step 2

    Customization

    Floors, glass, insulation, heat, furniture. You pick the upgrades; we write them into the spec.

    The capsule arrives finished. This step is where you decide how finished.

    You can keep the standard spec, or ask for more: laminate or another floor, heated flooring, premium glazing, enhanced insulation, custom furniture built to the bay. We confirm what is possible on Apple cabin and on Apple cabin XL, what it costs, and what it does to the lead time. Nothing is guessed on the truck. The specification you sign here is the house we build.

  3. Step 3

    Offer

    A written offer, a deposit, a production slot. The capsule is yours to build.

    You receive the offer: model, upgrades, price, and the week we can start. A deposit places the order and holds that slot.

    Until the deposit clears, the house is still a conversation. After it, the spec is locked and we buy the shell, the glass, and the fit-out against your name. Changes after this point are possible only where the build still allows them, and they move the calendar.

  4. Step 4

    Manufacturing

    The white module is made as a finished house, not a kit of parts. You wait; we send progress.

    Manufacturing is the long quiet stretch. The composite shell, the black-framed glass, the kitchen, the bath, the heat pump, and every upgrade from the spec go in at the factory — so the plot does not become a building site.

    We build to the signed specification. When the capsule is closed and ready for the road, we book the crane window with you.

  5. Step 5

    Delivery

    The house travels as one piece. A crane sets it on piles. You keep the last metres of track clear.

    We arrange the road and the crane day. You prepare access: a path the truck and the crane can use, with the last stretch to the footprint left open.

    The capsule leaves the factory finished. It does not get assembled in the orchard. On the booked day it arrives, the crane lifts it, and it lands on the piles waiting for it.

  6. Step 6

    Installation

    Screw piles, services, handover. Typically one to two days on a prepared plot.

    Piles go in first. The capsule sits, we connect water, power and the heat pump, and we walk the spec with you — standard and upgrades — before we hand over the keys.

    You keep the land. We bring the house. From the morning of the lift to the first night inside is a short window, because the building work already happened somewhere else.

Tell us the model and the plot.

Apple cabin or Apple cabin XL, the country, and how you want it finished. We reply with a written offer.